Duty Drawback Forms: CBP Form 7551, 7552 and 7553, and What Replaced Them

The short answer

Only one duty drawback form is still in use: CBP Form 7553, the Notice of Intent to Export, Destroy, or Return Merchandise for Purposes of Drawback. CBP Forms 7551 and 7552 are abolished: since February 24, 2019 every drawback claim is an electronic drawback entry in ACE under 19 CFR Part 190, and transfers are proved with business records. For a manufacturer exporting a third of its machines, the practical news is that its exports usually need no Form 7553 at all; the notice follows unused, rejected and destroyed goods.

Next step:See how a drawback claim gets built

In this post
  1. Which duty drawback forms are still used?
  2. Is CBP Form 7551 still used, or is the claim filed in ACE?
  3. What replaced CBP Form 7552, the certificate of delivery?
  4. What is CBP Form 7553, and who has to file it?
  5. What documents are required for claiming duty drawback?
  6. What are the drawback deadlines?
  7. Who files the drawback claim?
  8. Where this fits in your drawback program
  9. References

I build trade compliance software, and a drawback claim is where an import record and an export record have to agree line by line. When a CFO asks for a drawback program, the first search usually turns up three form numbers from the old paper process. Two of them no longer exist. This post maps each form to what replaced it, who files what, and the clocks that decide whether a claim pays. What drawback is and how the whole procedure runs is in our duty drawback explainer; who qualifies as an exporter is in duty drawback for exporters.

Which duty drawback forms are still used?

One: CBP Form 7553, the notice of intent, which the regulations still name by number [2]. CBP said so plainly in its November 24, 2025 notice reinstating the drawback information collection: "Please note that CBP Forms 7551 and 7552 are both abolished. From February 24, 2019, onward, TFTEA-Drawback, as provided for in part 190, is the only legal framework for filing drawback claims." [1]

FormWhat it wasStatusWhat replaced it
CBP Form 7551Drawback Entry, the paper claimAbolishedThe electronic drawback entry in ACE, with the data elements in 19 CFR 190.51 [3]
CBP Form 7552Certificate of Delivery, and Certificate of Manufacturing and DeliveryAbolished; "no longer be requested or accepted" [1]Business records of each transfer, with the items listed in 19 CFR 190.10(b) [4]
CBP Form 7553Notice of Intent to Export, Destroy, or Return Merchandise for Purposes of DrawbackIn use; updated for TFTEA drawback [1]Nothing; it is still filed before the export, return or destruction [2]

Bottom line: For a trade compliance manager starting drawback at a manufacturer with $4M of duty a year, the forms checklist is short: one notice that may never apply to your machines, and an electronic claim whose data your ERP, your broker's entry records and your export records have to supply.

The form count is not the hard part. CBP's own estimate for Form 7553 is 150 respondents filing 20 notices each, 3,000 notices a year at 33 minutes apiece, or 1,650 hours across the whole country [1].

CBP sizes the Form 7553 workload at 1,650 hours a year
Estimated respondents
150
Notices filed per year
3,000
Minutes per notice
33
Total burden hours
1,650

Source: CBP, 30-day notice for OMB 1651-0075, FR Doc. 2025-20764, November 24, 2025

That is a small, specialist filing. The time in a drawback program goes into the claim data behind the ACE entry, not into forms.

Is CBP Form 7551 still used, or is the claim filed in ACE?

No paper Form 7551 is filed; the claim is a drawback entry transmitted through a CBP-authorized electronic system, which is ACE [1][3]. Under 19 CFR 190.51(a)(1), a complete claim is "the successful electronic transmission to CBP of the drawback entry", plus any required Form 7553, the applicable import entry data, and evidence of export or destruction [3].

The fields the paper form once held are now listed in the regulation. For a manufacturing claim, the drawback entry carries, among others [3]:

  1. The claimant identification number, and the broker identification number if a broker files.
  2. The drawback entry number and the provision claimed, such as 19 U.S.C. 1313(a) or (b) [10].
  3. For each designated import entry line: the entry and line number, a description, the 10-digit HTS code, the duty paid, the entered value, quantity and unit, and a unique import tracing identification number.
  4. The manufacturing ruling number, the factory, the dates of use, the HTS code of the finished article, and a manufacture tracing number.
  5. For each export: the unique export identifier, the destination, the exporter's name, and the claimant's certification that the article will not be relanded without paying duty.

Those import lines come straight from your entry summaries, so a claim is only as good as the Form 7501 data behind it. Accelerated payment, where CBP pays estimated drawback before the claim liquidates, is requested on the same entry with a surety code and bond type [3][11].

What replaced CBP Form 7552, the certificate of delivery?

Business records replaced it: CBP Form 7552 "will no longer be requested or accepted to demonstrate the transfer of merchandise" [1]. When imported components move from the importer to another party before export, 19 CFR 190.10 (and 190.24 for manufacturing drawback) lets the transferring party pass the drawback right along, provided it keeps records that document the transfer, identify the goods and assign the right [4].

The records must show eleven items [4]:

What the transfer record showsWhy the claim needs it
Who received the goods, and the date of physical deliveryTies the transfer to a party and a date
Import entry number and line item numberPoints to the duty that was paid
Quantity delivered (and, for substitution, the total quantity on that entry line)Limits the refund to what moved
Total duties, taxes and fees on the delivered goodsSets the base for the refund
Date of import, port of entry, and the party it came fromProves the chain back to the import
Description and the 10-digit HTS code from the entry summary lineMatches the claim to the entry
For 1313(j)(2) substitution, the 10-digit HTS code of the substituted goodsSupports the substitution test

The retention clock is 3 years from liquidation of the related claim [4].

Quotable insight: The certificate of delivery did not disappear; it moved into your ERP. 19 CFR 190.10 asks the transferor for the facts the old Form 7552 carried, plus the entry line item number and the 10-digit HTS code, but as business records nobody sends to CBP until it asks. A manufacturer whose suppliers or affiliates touch imported parts before export now owns that paperwork itself, and the first claim filed against an entry line fixes the calculation method for every later claim on that line under 190.10(c).

That last rule is the trap in a transfer-heavy program. Regardless of any agreement between the parties, "the method used for the first filed claim" on an entry summary line, per unit averaging or not, governs all later claims on that line [4]. Decide the method before the first claim, not after.

What is CBP Form 7553, and who has to file it?

Form 7553 is the notice that gives CBP the chance to examine goods before they leave or are destroyed, and it applies to three cases, not to every export [2][5]:

CaseRuleLead timeCBP's reply window
Export of unused merchandise, 19 U.S.C. 1313(j)19 CFR 190.35(a)At least 5 working days before export, at the port of intended examination2 working days
Return of rejected merchandise to CBP custody, 1313(c)19 CFR 190.42(c)At least 5 working days before the intended return2 working days
Destruction under CBP supervision, any drawback type19 CFR 190.71(a)At least 7 working days before destruction, at the port where it happens4 working days

The claimant or the exporter files it (the claimant alone, for a destruction) [2][5], signed by someone with authority under 19 CFR 190.6 [8]. For unused merchandise the notice must certify that the goods were not used in the United States, and give the bill of lading number if known, a contact person and the location of the goods [2].

For our persona, the useful conclusion is what is missing from the table: the export of a finished machine under a manufacturing drawback ruling. Subpart B of Part 190, which governs manufacturing drawback, has no notice-before-export rule, and 190.72 asks for notice of intent only "if applicable" [7]. A manufacturer needs Form 7553 when it destroys drawback merchandise or articles, returns rejected imports to CBP custody, or exports imported parts unused, such as spare components shipped as replacement parts, which is unused merchandise drawback (how that works for returns and re-exports).

Can you stop filing a 7553 for every shipment?

Yes, with a waiver of prior notice under 19 CFR 190.91, available to unused merchandise and rejected merchandise claimants [6]. An approval works only for exports or destructions after its date, CBP can stay or revoke it, and a waiver granted before February 24, 2019 stays in effect only if each claim carries the certification in 190.91(a)(2) [6].

What if goods already left without one?

19 CFR 190.36 gives one fallback: a written application to the drawback office stating why CBP was not notified, the export period, products, HTS numbers, estimated number of exports and claims, ports, estimated claim value, and a certification that records proving the goods were unused will be available [6]. The procedure "may be used by a claimant only once, unless good cause is shown" [6]. Treat it as the one mistake the rules forgive.

What documents are required for claiming duty drawback?

Proof of export must establish the date of export, the exporter, a description of the goods, quantity and unit of measure, the Schedule B or HTS number, and the country of ultimate destination [7]. The documents behind it can be records kept in the normal course of business [7]:

  • Carrier records: bill of lading, air waybill, freight waybill, Canadian customs manifest or cargo manifest.
  • Records from a CBP-approved U.S. Government electronic export system [7].
  • Official postal records for goods exported by mail.
  1. Import entryEntry line, HTS code and duty paid from the entry summary
  2. Transfer recordsOnly if another party handles the goods, 19 CFR 190.10
  3. Manufacture or hold unusedRuling records for manufacturing; no use for unused goods
  4. Form 7553 if requiredUnused, rejected or destroyed goods, 5 or 7 working days ahead
  5. Export or destructionCarrier, electronic export or postal records
  6. Drawback entry in ACEWithin 5 years of the import date
  7. Keep the records3 years after the claim liquidates

Goods subject to USMCA drawback, those exported to Canada or Mexico or used to make goods exported there, follow 19 CFR Part 182, Subpart E, in addition to Part 190 (19 CFR 182.41, 182.43) [13]; how the cap there works is in the lesser of two rule. Which duty lines a manufacturing claim can return, Section 301 and 232 included, is in manufacturing drawback for Section 301 and 232.

What are the drawback deadlines?

A complete claim must be transmitted within 5 years of the import date of the merchandise it designates, and a claim not completed in that window is abandoned [3]. The full clock sheet:

ClockLengthSource
Form 7553 before an unused or rejected export or returnAt least 5 working days19 CFR 190.35, 190.42 [2]
Form 7553 before a destructionAt least 7 working days19 CFR 190.71 [5]
Complete claim filedWithin 5 years of import19 CFR 190.51(e) [3]
Rejected claim completedInside the same 5 years19 CFR 190.52(a) [3]
Record retention3 years after the claim liquidates19 CFR 190.15, 190.38 [9]

The 5-year window runs from each import, not from the program's start. A claim completed today can designate imports from up to 5 years before today, but the oldest of those lines expire first, and a manufacturing claim also needs its ruling in place before it is filed (19 CFR 190.7, 190.8); each month of delay drops a month of entries off the back of the window.

Who files the drawback claim?

The exporter is entitled to claim drawback unless it waives that right and assigns it, by certification, to the manufacturer, importer or an intermediate party [12]. The drawback entry and any Form 7553 must be signed or electronically certified by an officer or employee who can bind the company, an employee with a power of attorney, or a licensed customs broker holding a power of attorney [8]. A manufacturer can file itself, or through a licensed customs broker or drawback specialist holding a power of attorney [8]; either way the company still owns the records and the certifications.

Where this fits in your drawback program

The forms are the easy part; the claim file is matching every export to the import entry line that paid duty. GingerControl's duty drawback service matches each export to its import entry, builds the claim file and tracks every claim, and a drawback filing partner submits each claim in ACE. "Up to 99%" is the ceiling in 19 U.S.C. 1313, not a promise [10]. GingerControl identifies and documents the opportunity; your licensed broker or counsel files. For a manufacturer that wants the matching to run inside its own systems, a custom GingerOS build can model drawback on its ERP and export records. It starts with Prototype Week: one call, then a clickable prototype of your own flow in three days, and a quote after.

References

  1. U.S. Customs and Border Protection, Agency Information Collection Activities; Reinstatement; Drawback Regulations (OMB 1651-0075)
    Data cited: Forms 7551 and 7552 abolished; TFTEA drawback the only framework from February 24, 2019; claims filed electronically in ACE under Parts 190, 181 and 182; Form 7553 updated; 150 respondents, 3,000 responses, 33 minutes, 1,650 hours
    Source: Federal Register, FR Doc. 2025-20764
    Published: November 24, 2025
  2. 19 CFR 190.35, Notice of intent to export or destroy; examination of merchandise (and 190.42, rejected merchandise)
    Data cited: Form 7553 at least 5 working days before export or return; CBP decision within 2 working days; required contents
    Source: eCFR, 19 CFR 190.35 and 19 CFR 190.42
    Published: eCFR current through November 18, 2026
  3. 19 CFR 190.51 and 190.52, Completion of drawback claims; rejecting, perfecting or amending claims
    Data cited: Complete claim elements; drawback entry data elements; 5-year filing limit; abandonment; rejection of incomplete or untimely claims
    Source: eCFR, 19 CFR 190.51 and 19 CFR 190.52
    Published: eCFR current through November 18, 2026
  4. 19 CFR 190.10 and 190.24, Transfer of merchandise
    Data cited: Records required for a transfer; first-filed claim fixes the method for an entry line; 3-year retention from liquidation
    Source: eCFR, 19 CFR 190.10 and 19 CFR 190.24
    Published: eCFR current through November 18, 2026
  5. 19 CFR 190.71, Drawback on articles destroyed under CBP supervision
    Data cited: Form 7553 at least 7 working days before destruction; CBP reply within 4 working days
    Source: eCFR, 19 CFR 190.71
    Published: eCFR current through November 18, 2026
  6. 19 CFR 190.91 and 190.36, Waiver of prior notice; failure to file a notice of intent
    Data cited: Waiver scope and pre-2019 waivers; one-time application when no notice was filed
    Source: eCFR, 19 CFR 190.91 and 19 CFR 190.36
    Published: eCFR current through November 18, 2026
  7. 19 CFR 190.72, Proof of exportation
    Data cited: Required export data and acceptable documentary evidence
    Source: eCFR, 19 CFR 190.72
    Published: eCFR current through November 18, 2026
  8. 19 CFR 190.6, Authority to sign or electronically certify drawback documents
    Data cited: Who may sign drawback entries and Form 7553
    Source: eCFR, 19 CFR 190.6
    Published: eCFR current through November 18, 2026
  9. 19 CFR 190.15 and 190.38, Recordkeeping
    Data cited: Records kept 3 years after liquidation of the claim
    Source: eCFR, 19 CFR 190.15 and 19 CFR 190.38
    Published: eCFR current through November 18, 2026
  10. 19 U.S.C. 1313, Drawback and refunds
    Data cited: Drawback provisions, including manufacturing (a), (b) and unused merchandise (j); 99 percent ceiling
    Source: U.S. Code, 2024 edition, govinfo
    Published: 2024 edition
  11. 19 CFR 190.92, Accelerated payment
    Data cited: Estimated drawback paid before liquidation; does not liquidate the entry
    Source: eCFR, 19 CFR 190.92
    Published: eCFR current through November 18, 2026
  12. 19 CFR 190.82, Person entitled to claim drawback
    Data cited: The exporter claims unless it waives and assigns the right by certification
    Source: eCFR, 19 CFR 190.82
    Published: eCFR current through November 18, 2026
  13. 19 CFR 182.41 and 182.43, USMCA drawback: applicability and goods subject to USMCA drawback
    Data cited: Subpart E applies in addition to Part 190; goods exported to Canada or Mexico, or used to make goods exported there
    Source: eCFR, 19 CFR 182.41 and 19 CFR 182.43
    Published: eCFR current through November 18, 2026

Questions people ask

We are starting a drawback program and old guides cite Form 7551: is it still used, or is the claim filed in ACE now?

Form 7551 is abolished. Since February 24, 2019 every drawback claim is an electronic drawback entry in ACE under 19 CFR Part 190, and the old form's data are now the claim's data elements in 19 CFR 190.51. For a manufacturer with $4M of duty a year filing its first claim, the work is assembling import lines, export records and certifications, not finding a paper form.

Is CBP Form 7552 still required when imported components pass through a supplier before export?

No. CBP no longer requests or accepts Form 7552, the certificate of delivery, to show a transfer. Under 19 CFR 190.10 the transferring party keeps business records with eleven listed items, including the entry line number, duty paid and 10-digit HTS code, for 3 years after the related claim liquidates. If components pass through two suppliers before export, each one has to keep that record.

What is CBP Form 7553, and does a manufacturer exporting finished machines need one?

Form 7553 is the Notice of Intent to Export, Destroy, or Return Merchandise for Purposes of Drawback, the one drawback form still in use. If you export finished machines under a manufacturing drawback ruling, you file no 7553 for those exports; you need one only if you destroy merchandise or articles, export imported parts unused, or return rejected merchandise for drawback.

CBP Form 7553 instructions for our first unused-parts export: how many days before export do you file it, and where?

For unused merchandise, file it at least 5 working days before export at the port of intended examination (19 CFR 190.35); a rejected merchandise return takes the same 5 working days at the port of return to CBP custody (190.42(c)), unless CBP allows another period or you hold a waiver. Destruction takes 7 working days at the destruction port. CBP replies within 2 working days, or 4 for a destruction.

Can we get a duty drawback waiver of prior notice so we stop filing a 7553 for every shipment?

Yes, for unused merchandise and rejected merchandise claims. You apply to CBP under 19 CFR 190.91, and an approval covers only exports or destructions after its date; it can share one application with drawback compliance program certification (19 CFR 190.195). If you ship 20 unused-parts exports a year, the waiver saves 20 notices. A waiver approved before February 24, 2019 needs the 190.91(a)(2) certification on each claim.

We exported unused goods without filing a 7553: can we still claim drawback?

Possibly, once. Under 19 CFR 190.36 you file a written application with the drawback office explaining why CBP was not notified, describing the exports, products and estimated claim value, and certifying that records proving the goods were unused will be available. The procedure can be used only once, so a second missed notice gets this relief only if CBP finds good cause, such as successorship.

Our CFO wants the first claim filed this quarter: how do we file a duty drawback claim in ACE, and what goes on it?

A complete claim is the electronic drawback entry plus any required Form 7553, the import entry data and evidence of export or destruction, sent through a CBP authorized system (19 CFR 190.51). The entry carries the claimant number, each import entry line with its HTS code and duty paid, the ruling number for manufacturing claims, the export identifier and destination, and your certifications.

Who files and signs a drawback claim: our company, our customs broker or a drawback filer?

The exporter may claim unless it assigns that right by certification (19 CFR 190.82). Under 19 CFR 190.6 the entry and any Form 7553 are signed by someone who can bind your company, an employee with a power of attorney, or a licensed customs broker with one. GingerControl's duty drawback service builds the claim file and a drawback filing partner submits it in ACE. GingerControl identifies and documents the opportunity; your licensed broker or counsel files.

We export about a third of our machines: what records prove export for a drawback claim?

Proof of export must show the export date, the exporter, a description, the quantity and unit, the Schedule B or HTS number and the destination (19 CFR 190.72). Bills of lading, air waybills, records from a CBP approved electronic export system and postal records all qualify. A manufacturing claim also needs records tying each import line to the exported machines under its ruling (19 CFR 190.26).

Our duty-paid imports go back to 2021: what is the duty drawback claim time limit, and how long do we keep the records?

A complete claim must be filed within 5 years of the import date of the merchandise it designates (19 CFR 190.51(e)); a claim left incomplete after that is abandoned. Records behind the claim are kept for 3 years after the claim liquidates (19 CFR 190.15 and 190.38). For a program covering five years of imports, some records live for eight years or more.

Our first drawback claim goes into ACE next month: how do we avoid errors that get it rejected?

CBP rejects an incomplete or untimely claim, which can be completed only within the same 5 years (19 CFR 190.52). Check every required 7553 exists, each import line, HTS code and duty matches the entry summary, and the first claim on a line uses your chosen method, since 190.10(c) locks it. GingerControl's duty drawback service matches each export to its import entry line. GingerControl identifies and documents the opportunity; your licensed broker or counsel files.

Your next step

Paying duty on goods you later export?

Hand this to GingerOS.

See how a drawback claim gets built Get your drawback claim sized

Pick a 30-minute slot on the next page with Chen Cui, our CEO. Bring one notice or one SKU list (an ERP export, a spreadsheet or an email will do) and see what GingerOS does with it.

Reviewed by Michael Weick, LCB / CCS
Customs compliance manager with 42 years of experience (ex Subaru of America, Merck, and Motorola).

More in CBP & Customs

Our Risk-Free Promise

Full refund.

If you’re not satisfied before MVP acceptance, get a full refund of your deposit.

Click Me!

See if you qualify